A pressure test bay. A lift and its rigging, for a load or for a person.
Bickley Consulting Engineers (BCE) is the practice of Terry Bickley, PE.
30+ years on closed, pressurized and rotating systems. He works for the company that owns the job, not for anyone selling into it: he reviews what is set up, writes what the fix has to do, checks what the vendors claim, and stays until your own people can run it and HSE has signed it off.
Blast Containment. Lifting and Rigging. Weld and Code. Noise and Vibration.
A stop is defensible. A restart needs somebody to write down what "safe enough" means for that bay and that tool, and the engineering opinion on offer may come from the company that wants to sell you the fix.
Terry is the independent engineer on your side. The first thing he does is a review of how the facility is run and what it is set up to test, against the codes and your own requirements, with a written report your whole team reads together: what is good, where the misses are, and a plan for closing them. It is not a sealed calculation. It is the first independent answer to the restart question, with his name on it.
It does not matter whether it is a test bay or a lift. If you are the one who stops it, he is the engineer who helps you say what it would take to start it again.
On blast containment he sells judgment, never hardware.
You would not let the other side's attorney draft your contract. They may be perfectly honest. They are not working for you.
In containment it is easy to end up there. The company that sells you the barrier can also be the one that runs the calculation that says the barrier is adequate.
Terry is hired by the company that owns the facility, to represent that company's interests against everyone selling into it. He reviews the facility, writes what the fix has to do, checks what each supplier claims it does, and stays through installation, the HAZOP (a structured review of everything that could go wrong and what prevents it) and the sign-off.
He does not sell the hardware.
Start with stage 1. Every stage ends with something your team can read, check and keep.
Can the enclosure hold what you test? Do the piping and system meet the ASME codes that apply? Are the controls safety-interlocked? Does it meet your own requirements?
Will the facility withstand the blast you want it to contain? He gathers the original records, from the steel's material test reports to the weld records, and finds the gaps.
Two specifications, one for the controls and interlocks and one for the mechanical upgrades. He finds and vets suppliers and checks the quotes and the engineering behind them.
The controls design, the parts and details, the bill of materials, who buys what, the trades coordinated, and a design far enough along for a firm price.
He verifies the installation. The HAZOP becomes the final test, witnessed by your HSE team. Procedures are written, operators trained, and the facility is signed back on.
The smallest useful thing is the review. Stage 1. You keep the report either way, and you know the next step before anyone quotes you a fix.
Ask for a Facility ReviewSome lifts do not have a product. The load is too heavy, the geometry is wrong, the pick points are in the wrong place, or the thing being lifted is the only one that will ever exist. Some lifts carry a person. Either way, the rigging needs somebody to be accountable for it. Not just a drawing.
Talk Through Your LiftCustom below-the-hook devices: the bars, beams and frames that hang from a crane hook and carry the load.
When a person is the load, or a crew has to tie off, there is no room for a guess. Fall protection anchor points, and personnel platforms hung from a crane or hoist.
Terry Bickley started on the shop floor, rebuilding the machine tools that made compressor parts. Over more than 30 years he moved through product design, acoustics, lead engineer on upgrades to a global test laboratory, and oilfield technology development. Each step added a layer: how a part is made, how it is designed, how it fails, and how to prove it will not.
That is why he can stand in a test bay, under a lift, or beside a noisy machine and tell you what is actually wrong. He is the engineer on the work, he works alongside your engineers on larger programs, and he stays with the project from the first review to the sign-off.
A test bay, a lift, a weld, or a machine nobody can explain. Describe the problem and you will get a straight answer about whether he should take it.